CN7009 RESOURCE MANAGEMENT AND
CONTROL IN CONSTRUCTION
UNIT I RESOURCE PLANNING
Resource Planning, Procurement,
Identification, Personnel, Planning for material, Labour, time schedule and
cost control, Types of resources, manpower, Equipment, Material, Money, Time.
UNIT II LABOUR MANAGEMENT
Systems approach, Characteristics of resources,
Utilization, measurement of actual resources required, Tools for measurement of
resources, Labour, Classes of Labour, Cost of Labour, Labour schedule, optimum
use Labour.
UNIT III MATERIALS AND EQUIPMENT
Material: Time of purchase,
quantity of material, sources, Transportation, Delivery and Distribution.
Equipment: Planning and selecting by optimistic choice with respect to cost,
Time, Source and handling.
UNIT IV TIME MANAGEMENT
Personnel time, Management and planning,
managing time on the project, forecasting the future, Critical path measuring
the changes and their effects – Cash flow and cost control.
UNIT V RESOURCE ALLOCATION AND
LEVELLING
Time-cost trade off, Computer application –
Resource leveling, resource list, resource allocation, Resource loading,
Cumulative cost – Value Management.
REFERENCES:
1. Andrew,D., Szilagg, Hand Book
of Engineering Management, 1982.
2. Harvey, A., Levine, Project
Management using Micro Computers, Obsorne -McGraw Hill C.A.Publishing Co., Inc.
1988. Industry, Granda Publishing Ltd., 1980.
3. James.A., Adrain, Quantitative
Methods in Construction Management, American Elsevier Publishing Co., Inc.,
1973.
4. Oxley Rand Poslcit, Management
Techniques applied to the Construction Industry, Granda Publishing Ltd., 1980.